Technical HSE & Risk Management

1. TECHNICAL HSE & RISK MANAGEMENT:

HSEIA development and components Business Interruption & Consequential Analysis
Development of COMAH Reports
Vent Dispersion Analysis
Safety Case Development
Flare Radiation Analysis
Major Accident Hazards (MAH) Identification
Failure Mode and Effect Analysis (FMEA)
Development of Bowties for identification of HSECES
Failure Modes, Effects and Criticality Analysis (FMECA)
SIL Assessment & Verification and Safety Requirements Specification (SRS) Development
Transportation Risk Assessment Study
Quantitative Risk Assessment (QRA) Waste Minimization Study
Building Risk Assessment (BRA),
Value Engineering Assessments
Emergency Response Planning (ERP) Safety & Risk Assessment Studies involving Consequence Modelling utilizing Computational
HSEIA development and components
Business Interruption & Consequential Analysis
Development of COMAH Reports
Vent Dispersion Analysis
Safety Case Development
Flare Radiation Analysis
Major Accident Hazards (MAH) Identification
Failure Mode and Effect Analysis (FMEA)
Development of Bowties for identification of HSECES
Failure Modes, Effects and Criticality Analysis (FMECA)
SIL Assessment & Verification and Safety Requirements Specification (SRS) Development
Transportation Risk Assessment Study
Quantitative Risk Assessment (QRA)
Waste Minimization Study
Building Risk Assessment (BRA), Value Engineering Assessments Emergency Response Planning (ERP)
Safety & Risk Assessment Studies involving Consequence Modelling utilizing Computational
• Development of HSECES, Performance Standards Development & Written Schemes of Examination
• Reliability, Availability & Maintainability Study
• Hazards & Effects Register, HEMP & Risk Register Development
• Dropped Object Study
• Hazard Identification (HAZID) Study
• Design Safety Review
• Environmental Impact Identification (ENVID) Study
• Layout Safety Review
• Occupational Health Identification (OHID) Study
• Constructability Review
• Waste Management Plan Development
• Fire Safety Assessment (FSA)
• Construction and Environmental Management Plan (CEMP)
• Fire Explosion Risk Assessment (FERA)
• Project Health Safety Environmental Reviews (PHSER) Study
• Incident Investigation
• Occupational Health Risk Assessments (OHRA) Study
• Simultaneous Operations (SIMOPS) / Manual of Permitted Operations (MOPO) Study
• Hazard and Operability HAZOP and / or HAZOP Revalidation Study
• Hazardous Area Classification
• SAFOP / Electrical HAZOP Study
• Active Fire Protection Design (includes Firewater Demand calculations, Firewater hydraulics and Tec
hnical Specification as per NFPA
• CHAZOP – Control HAZOP Study
• Passive Fire Proofing Design as per API-2218 includes fire hazard evaluation, schedule and drawings
• Functional Safety / Layer of Protection (LOPA) Analysis
• Firefighting and Safety Equipment Layout
• Fire & Gas Mapping Study
• Project Risk Assessments (PRA)
• Escape Evacuation & Rescue Analysis (EERA)
• Enterprise Risk Management Study
• Emergency System Survivability Analysis (ESSA)